Quantcast
Channel: Symantec Connect - Backup and Recovery - 讨论
Viewing all articles
Browse latest Browse all 3749

Error code 200 - Due to overlapping frequency based schedules

$
0
0
我需要解决方案

I have a Windows Server 2008 R2 64-bit, Netbackup 7.5.0.6 master server for my virtual datacenter. I run vmware query based policies with overlapping full and differential backup schedules. I have 150 policies for about 2,000 virtual servers that start off in 30 minute increments from each other spread out accross a 24 hours per day, 7day window. Over time this has migrated to a steady and fairly even rate of data processing distribution throughtout the window. My backup failure rate before removing the false positive is under 1.5% on average each week. It would be less that that if there was a way to prevent these error/exit code 200's from occuring which are only informational in nature. Is there a way that when Netbackup finds that it has no jobs that are needed to run for a query based policy that they could be an exit code 0?


Viewing all articles
Browse latest Browse all 3749

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>