Question on Scheduling jobs and cmdline for checking job history

$
0
0
我需要解决方案

Hello,

I have to schedule backups for one of the windows server and facing some issues with the schedule as the backups are not running on the scheduled time.

I have created a new policy and wanted it to run as mentioned below:

  1. 7 days a week differential backups
  2. Once a week full backups.

And the screenshot of the schedule is attached here.

Both incremental and full backups are scheduled to run from 18:00 -05:00AM.

Couple of questions:

  1. Is this right? I am noticing the backups are not running as expected? (most likely I am missing something). On the day of full backup should I exclude the differential backup run? I am guessing something is wrong with the duration but not able to find out the exact cause? In fact other jobs with similar schedules are running as expected.
  2. As there are a lot of jobs, the activity monitor is getting cleaned quite frequently. Does bpdbjobs give an option to check the historical details of job run based on policy (For eg: I was looking for something like bpdbjobs --policy <policy name> --start date <start_date>--end date <end_date> should give me the details of the job runs of that particular policy in the time specified.

We are running Symantec Netbackup v7.5.0.1 in Solaris v10.

Please let me know if you have any questions.

-Ram Kumar