Quantcast
Channel: Symantec Connect - Backup and Recovery - 讨论
Viewing all articles
Browse latest Browse all 3749

Is there a way to configure a maximum run time for a job

$
0
0
我需要解决方案

I have a Windows 2008 R2 master server running Netbackup  7.6.1.2.  We use VMware Intelligent policies to backup our VMs every other day.

I have one VM client in the policy that ran 88 hours over the long weekend (basically not doing anything for the last couple days).  I'd like to be able to set some extreme maximum run time for a job - perhaps 3 days.  My searches show that this is possible in Backup Exec but I don't see any feature like this in Netbackup.  Am I missing it?

0

Viewing all articles
Browse latest Browse all 3749

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>