Quantcast
Viewing all articles
Browse latest Browse all 3749

Upgrade to 7.6.0.2 job failures with Network errors 41 and 636

我需要解决方案

After recent upgrade to 7.6.0.2 different job fail with network connection issues error 41 and 636.
I have looked through the forums and added the key to change the time out from 2 hours to 15 minutes.
The job complete when I retry on the 3rd time in the morning.

Job log below:

1st fail

10/07/2014 19:06:32 - Info bpbkar32(pid=8972) done. status: 41: network connection timed out     
10/07/2014 19:06:32 - end writing; write time: 1:02:40
network connection timed out(41)

2nd Fail

10/07/2014 19:36:58 - Info bptm(pid=1508) start           
10/07/2014 19:36:58 - begin writing
read from input socket failed(636)
10/07/2014 20:10:15 - Error bpbrm(pid=960) from client dcpwaexch03: ERR - Terminating backup.     
10/07/2014 20:10:15 - Error bpbrm(pid=960) from client dcpwaexch03: ERR - failure reading file: Microsoft Information Store:\DCPWAEXCH03 SG1\DCPWAEXCH03 SG1 DB1 (BEDS 0x0: )
10/07/2014 20:10:15 - Warning bpbrm(pid=960) from client dcpwaexch03: WRN - Exchange Validation for 'Microsoft Information Store:\DCPWAEXCH03 SG1\' failed.  Please refer to the backup and application event logs for more details.
10/07/2014 20:10:25 - Error bpbrm(pid=960) could not send server status message      
10/07/2014 20:10:27 - Error bpbrm(pid=960) could not write EXIT STATUS to OUTSOCK     
10/07/2014 20:10:27 - Info bpbkar32(pid=2896) done. status: 13: file read failed    

Status: read from input socket failed(636)

We never have issues with our network there are no firewalls between master and media servers. All servers are VM on VMware.


Viewing all articles
Browse latest Browse all 3749

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>