Hi,
1)
I have scheduled NDMP backup. In backup selections I have created 6 New Streams and inside each stream I have specified some paths of the data to be backed up.
When the policy is triggered 1 Master job and 6 Child jobs are initiated. After their completion some child jobs show partially completed. I note the paths failed from the detailed status of the child job. I opened one policy named as partial policy and went to Backup Selections and created 1 New Stream and under this I pasted the paths which were failed.
But when i run the partial policy - 1 master job was initiated then one child job. But 1 more job initiated named as "New Stream" as showing in job overview.
Theoretically only two jobs should start - 1 master and 1 child then what is the purpose of the 3rd job.
2)
One more thing I am getting. As I know if all child jobs are completing successfully i.e. 0 then the master job should also reflect the status code 0 i.e. completed successfully. But why in some cases it shows partial with status 1 and in some cases failed with status 99.