Hi,
Issue: 1) SLP duplication jobs cancelled. (2) How to assign Same media server another pure disk.
Currently our SLP (Duplication) jobs schedule Saturday Night to Monday Morning, but during this period SLP replication not completed.
So I have tried to change the SLP schedule every day night (8:00PM to 4:00AM) (Asume that running SLP jobs will suspend and same will continue after that).
After changes pending/running SLP jobs are cancelled not suspended.
Our Setup:
All is Pure disk storage.
We are not using any Tape drive.
Offsite also storage disk.
Network bandwidth is low, so try to schedue in every night.
Windows 2008 R2 (Master server)
Windows 2008 (Media Server)
One Media server 15TB space allocated (Pure disk) now 5TB another disk partition is free (not in used)
As per symantec document:
NetBackup 7.6 Administrator's Guide I found the reason why the SLP cancels instead of suspend the image when the backup window closes.
As we are not using storage units of type “AdvancedDisk” or “Media Manager”, but “PureDisk”, the SLP cannot suspend the image and will proceed with one of the options we can select in “window closure preference”:
Please suggest...
1) How configure the replication SLP for every night.
2) How allocate another remaining disk (5TB) via Pure disk (It's not allowed).
Regards,
Atharava